Regional Infrastructure Development Fund – RIDF
newsare.net
BMZ-ID 2010 66 562, 2011 65 034, 2013 65 048, 2014 67 885, 2015 67 762, 2016 67 633 Prequalification Design and Construction of 12 km Gravel Road in Northern Afghanistan BGL-R-2019-02 Construction of Mazar Dara Road (12 km Gravel) The existing dirt and thinlRegional Infrastructure Development Fund – RIDF
BMZ-ID 2010 66 562, 2011 65 034, 2013 65 048, 2014 67 885, 2015 67 762, 2016 67 633 Prequalification Design and Construction of 12 km Gravel Road in Northern Afghanistan BGL-R-2019-02 Construction of Mazar Dara Road (12 km Gravel) The existing dirt and thinly graveled road will be upgraded to a standard two-lane carriageway … Read more