ECRL Gombak station’s covered link bridge to LRT ready by March 2027, temporary walkway in place for December launch
Full story
Passengers at the East Coast Rail Link Gombak station will use a temporary walkway for the launch in December. A permanent covered link bridge connecting to the LRT is expected to be ready by March 2027.
KUALA LUMPUR, Oct 23 — Passengers using the East Coast Rail Link (ECRL) Gombak station will have a temporary walkw...