Nigeria’s grid breaches limits despite 85% plant utilisation
Full story
Nigeria's electricity grid operated outside the required voltage and frequency limits during October. This happened even though power plants were utilizing 85% of their available capacity.
Nigeria’s electricity grid operated outside prescribed frequency and voltage limits in October, despite power plants using 85% of available capacity. Read More: https://punchng.com/nigerias-grid-breaches-limits-despite-85-plant-utilisation/