BRALIRWA Plans 250 Million-Litre Brewery in East Rwanda
Full story
BRALIRWA Plc intends to build a new beverage manufacturing plant. The facility will be located in the Rwamagana Industrial Zone in East Rwanda. It is expected to produce up to 250 million litres of beer.
BRALIRWA Plc is planning to establish a new beverage manufacturing plant in Rwamagana Industrial Zone, with the proposed facility expected to produce up to 250 million litres of beer and… The post BRALIRWA Plans 250 Million-Litre Brewery in East Rwanda appeared first on KT PRESS .