Electric truck charging plans target Durban-Gauteng N3 freight corridor
Full story
CHARGE intends to double the capacity at two of its N3 charging hubs. This target is set for the end of 2026. These hubs are located on the freight corridor between Durban and Gauteng. Plans for truck battery-swapping facilities exist, but they do not have a confirmed opening date.
CHARGE plans to double capacity at its two N3 charging hubs by the end of 2026, while proposed truck battery-swapping facilities remain without a confirmed opening date.